Search results for: concrete in all categories

249 results found.
Probuild is proud to have delivered one of the tallest and most iconic new building landmarks in the Melbourne CBD, in conjunction with client UEM...
... ,557 m3 of concrete used - 5 ...
Terms matched: 1  -  05 Mar 2020
The first section of the Metro Tunnel is now complete – with the first tunnel boring machine, Joan, today breaking through to complete the journey...
... installed the tunnel's massive concrete rings. After ...
Terms matched: 1  -  02 Mar 2020
Work on the Northern Pathway is gathering momentum with the shortlisting of two teams to prepare proposals for the detailed design and constructio...
... complex steel girder and concrete bridge projects. ...
Terms matched: 1  -  02 Mar 2020
Dexus partners with SparkBeyond to unleash AI-powered insights across its portfolio. Recognising the power of data and analytics as a game-changer...
... platform designed to generate concrete solutions to specific ...
Terms matched: 1  -  02 Mar 2020
Early cracking in concrete can be defined as developing with in the first 7 days after casting or placement. It’s a common problem, so much so tha...
... 2020 Early cracking in concrete can be defined ...
Terms matched: 1  -  25 Feb 2020
In a major milestone for METRONET's Forrestfield-Airport Link project, tunnel-boring machine (TBM) Grace has broken through the Bayswater dive str...
... ,000 locally fabricated concrete segments - used ...
Terms matched: 1  -  24 Feb 2020
The use of Building Information Modelling (BIM) is rapidly increasing in the design, construction, operation and maintenance of building and infra...
... seven different strengths of concrete were being ordered ...
Terms matched: 1  -  19 Feb 2020
Boral concrete has received global GreenTag certification for producing concrete with less energy-intensive materials. The recognition is Boral’s ...
... awarded global certification for concrete 13 February 2020 ...
Terms matched: 1  -  13 Feb 2020
The first major piece of infrastructure at Western Sydney International (Nancy-Bird Walton) Airport is complete with Badgerys Creek Road ready for...
... with 900 tonnes of concrete. For the ...
Terms matched: 1  -  13 Feb 2020
Construction of the Metro Tunnel Project’s new State Library Station is well underway, with the main station cavern now excavated and work startin...
... three times harder than concrete. The road ...
Terms matched: 1  -  12 Feb 2020
Result Pages: << Previous 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Next >>
Recommended Links
 Search by:         NSW            VIC            QLD            WA            SA            TAS            NT            ACT            NZ            More>
menu AEOL   
 
Follow Add What is AEOL?